Navin's PRESIDIUM
 
Front Elevation
Location
Flats Details
Site Plans
Specifications
Features

Payment Schedule

Project Status
Click to download E-Brochure

Click here to enlarge

Location
 
Click here to download
Address: No.# 103 Nelson Manickam Road, Aminjikarai, Chennai-600 029.

Flat Area

Floor
Front Block
Rear Block
4570 sft
--
--
7938 sft
2 to 9 Floors
5080 sft
8660 sft

Flat Area and Availability

FLOORS
          Front Block

Rear Block

Ground
4570
7938
I
5080
8660
II
5080
8660
III
5080
8660
IV
5080
8660
V
5080
8660
VI
5080
8660
VII
5080
4330
4330
VIII
5080
8660
IX
5080
8660
  Available    

Project Plans
 
Site Plan
   
Click here to enlarge

Basement FloorPlan 'B'  
   
   
Ground Floor 'A'
   
Click here to enlarge
 
Ground Floor 'B'
 
Click here to enlarge
 
First Floor 'A'
 
Click here to enlarge
 
First Floor 'B'
 
Click here to enlarge
 
Typical Floor 'A'
 
Click here to enlarge
 
Typical Floor 'B'
 
Click here to enlarge

Specifications
 
Foundation
:
R.C.C Cast in-situ Piles upto the rock strata at a depth of about 30 M.
Structure
:
R.C.C framed structure with post tensioned Flat slab construction.
Doors & Windows
:
Glass Doors in Aluminum Frame at Entrance Areas and Teakwood frame with solid core flush doors at other areas. Aluminum framed glazed windows and aluminum adjustable louvered ventilators.
Flooring
:
Polished granite/marble flooring in main staircase and landing lobbies. Marble or Vitrified Tiles Flooring
in Toilets. Gramoflooring in office areas.
Toilets
:
Ladies and Gents toilets in each floor. Ground Floor Common toilets for Drivers and others. Concealed
plumbing and ceramic glazed tiles dadoing for toilets. Vitreous clay [White] Urinals, water closets and wash basin [white] inside toilets. Jaquar or equivalent plumbing fittings.
Internal Finishing
:
The walls and ceiling will be plastered suitably and painted with cement paint. Doors and Windows: enamel paint.
External Finishing
:
Long life textured matt painting and glass paneling as per architectural elevation.
Water Supply & Fire Fighting
:
Sump or other provision to receive Metro water supply. Bore well/Open well for tapping ground water. Pumps and overhead tanks of adequate capacity. Separate sump for Fire Fighting; pressure
pump and wet riser fire fighting system.
Electricity
:
3 Phase LT [Low Tension] power supply with independent meter for each floor through a
transformer yard terminated at a main panel board and distributed to DBs in every floor. Internal wiring and switches will not be provided by the promoter. Common area yard, and garden lighting will be provided.
Service Ducts, Elevators
:
Service ducts would provide convenient access for cabling, piping and other infrastructural services. Automatic 10 passenger Elevators with stainless steel car, V3F down collective with infrared sensors 2 Nos. in Block “A” and 3 Nos. in Block “B” plus one service lift in Block “B”.
Stand by Generator
:
Standby Generator to provide backup power for elevators, common area lighting and pumpsets.
Internet
:
Broadband Internet Connectivity will be provided. Usage charges to be borne by occupants.
External Areas
:
Common areas outside the building will be paved and suitably landscaped and properly lighted. Adequate provision for rainwater harvesting.

SCHEDULE OF PAYMENTS
 
50% Advance at the time of booking
25% upon completion of Shell frame
20% upon completion of structure & Plastering
5% before handing over.

PROJECT STATUS
 
Presidium
:

A  Block:  Paving  block work  under  progress.  Plumbing  work  has been completed  except  fittings.  Electrical  work has been completed  except fittings.  Falls ceiling work is under  progress. Stair case wall putty is under progress.

   

B  Block:  All floors screed concrete work has been completed.  Basement & car parking  flooring  has been completed.  External filling & leveling work for paving block is under progress.  External fire fighting work has been completed. Pump room work is under progress.  Structural glazing work is  under progress. SS  & MS hand rail  work is  under progress. Falls ceiling work  is under  progress. Stair case wall putty is under progress. Granite laying work  & lift granite cladding work  is  under progress.

   
Status As on 29thFebruary2008

CLICK HERE TO DOWNLOAD 0.99MB

"The details shown in this page are for the purpose of illustration only. The information contained herein is subject to change and cannot form part of an agreement or contract."