Front Elevation  
Location  
 
Specifications  
Features  
Payment Schedule  
 
Permit Number from CMDA - B/Spl.Bldg/109/2011 Dt.31.03.2011
Click here to enlarge
 
Address:
Plot No.68 & 69,
VGP. Dr.Seethapathy Nagar,
Velachery,
Chennai – 600042.

Topo Plan
 
 
 
 

 
PROJECT STATUS
Jasmine Buds  
Previous
Next
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 9
 
 
 
SPECIFICATIONS
 
Structure
:
R.C.C. Seismic Resistant Framed Structure.
Walls
:
Brick Work in cement mortar.
Doors&Windows
:
Teak Wood door frame for main door and other doors in country wood door frame with flush type shutters. Country Wood or UPVC windows with glazed shutters.
Flooring
:
Vitrified tile flooring inside the flat.
Kitchen
:
Polished Granite Platform with stainless steel sink. Ceramic Tiles Dadoing. Provision for Aquaguard.
Toilets
:
Ceramic tiles flooring and dadoing with good quality sanitary (Cascade or equivalent) and plumbing (Jaquar or equivalent) sanitary fittings in toilets.
Electricity
:
Three Phase Electric Supply with concealed copper wiring circuit Breaker and A.C. Point in all Bed rooms, split A/C point in living.
Finishing
:
Internal walls plastered in cement mortar, finished with wall putty and interior emulsion.
Doors&Windows
:
Enamel Paint.
Main Door
:
Polished.
Outer Walls
:
Exterior Matt Paint.
Water Supply
:
Sump to store Water, Bore Well / Open Well for Tapping Ground Water, with arrangements for Pumping Water to over head tank. Lines run from these tanks to each flat.
Parking Facility
:
Stilt floor and open car parking.
     
 
FEATURES
One covered and one open car park for each flat
Security Intercom
Beautiful Landscaping
Rain Water Harvesting
Piped Gas supply
Standby Generator for lift and common areas
5 Passenger Lift of reputed make
 
 
SCHEDULE OF PAYMENTS
 
On booking
:
25%
At the time of Registration
(within 30 days from date of booking)
:
35%
On Completion of foundation work
:
10%
On Completion of respective roof
:
10%
On completion of internal plastering
:
10%
On Completion of Laying of flooring
:
5%
Before Handing Over
:
5%
     
Extra Expenses:
Registration, Legal fees and documentation charges and incidental expenses Infrastructure, Developmental Charges and Sales Tax / VAT Amenities fees
Service connection charges, fees, deposits and incidental expenses for electricity, water supply and Sewerage Contribution to building maintenance fund.
 
 
Click here to download 1.12 MB
"The details shown in this page are for the purpose of illustration only. The information contained herein is subject to change and cannot form part of an agreement or contract."